Performing during operation tests in accordance with the Technical Order (TO) is essential after closing the load contactor and confirming that the load does not exceed 60 kW. This step ensures that the generator is functioning within its specified performance parameters and allows for the assessment of its operational reliability under load conditions.

Conducting these tests can help verify that all systems are operational, identify any potential issues while the generator is under load, and ensure the equipment is performing as designed. It provides crucial data that helps in the ongoing maintenance and troubleshooting of electrical power systems, ensuring they operate efficiently and safely.

In contrast, while checking fuel levels, monitoring generator temperature, or shutting down the generator are important maintenance and safety steps, they do not follow the sequence prescribed once the load is engaged. Checking fuel levels, for instance, is typically performed before operations begin to ensure adequate resources for generator function, and monitoring temperature is generally a continuous process rather than a specified next step after closing the load contactor. Shutting down the generator would be a reaction to a fault or an anomaly rather than a standard procedure following load engagement.